Jump to content

Recommended Posts

Geschrieben

Is there still no solution available for doing even basic load management with WARP Energy Manager 2.0 with non-WARP charging stations in the network? OCPP or ModBUS TCP or anything else?

It looks like a great solution for our building, but not being able to use third party chargers (even if the functionality were limited) is simply disqualifying.

Geschrieben

OCPP is made for that. You either need to set up your own OCPP server or use an online service. Then you need to configure all chargers to use that.

However, you will not be able to use any of the Energy Manager’s advanced features, such as PV excess charging. In fact, you don’t need an Energy Manager at all if you have OCPP to control all chargers.

Edit: Actually, now that I think about it, you can give EVCC a try. It can do PV excess charging and can control chargers from many manufacturers.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Gast
Reply to this topic...

×   Du hast formatierten Text eingefügt.   Formatierung jetzt entfernen

  Only 75 emoji are allowed.

×   Dein Link wurde automatisch eingebettet.   Einbetten rückgängig machen und als Link darstellen

×   Dein vorheriger Inhalt wurde wiederhergestellt.   Clear editor

×   Du kannst Bilder nicht direkt einfügen. Lade Bilder hoch oder lade sie von einer URL.

×
×
  • Neu erstellen...